projectsDoha Tower
fall 2007 to spring 2009 (Murphy/Jahn Architects project)
This mixed use project consisted of a 239,300 square meter convention center and a 550 meters tall tower. I was a tower team member from the schematic design phase to the end of the construction documents phase (involved in 100 percent schematic design submission, 100 percent design development submission, 100 percent construction documents submission, 2 addendums, and 1 bulletin).I worked on the development and the documentation of the tower's core, mechanical levels, below grades, and provisional fit-out plans. I also was involved in the coordination of the architectural design with the primary concrete structural engineers, mepf engineers, product manufacturers, and landscape and lighting designers.

Note: Models above built by other. Construction document samples are available upon request.